PM Surya Ghar Subsidy Status 2026: Track Your ₹30,000–₹78,000
Your rooftop solar subsidy moves through fixed stages on the national portal. This guide explains each stage, the official 15-day processing window after redemption, and why payments get held.

Checked on 25 September 2026 against the PM Surya Ghar national portal and the PIB release of 24 March 2026.
Answer 5–7 simple questions and get your eligibility score in 2 minutes.
Check eligibility now →At a glance
- Scheme open till
- 31 March 2027
- CFA processing
- ~15 days after redemption
- Track at
- pmsuryaghar.gov.in
- Progress
- 26+ lakh installations (Mar 2026)
What is it?
PM Surya Ghar: Muft Bijli Yojana gives Central Financial Assistance (CFA) to households installing rooftop solar — ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or above. The whole flow — application, DISCOM approval, installation, inspection, commissioning and subsidy — runs online on the national portal. As of 19 March 2026, over 26.19 lakh systems were installed and ₹17,967 crore disbursed as CFA.
Benefits
The subsidy goes directly to your bank account (or loan account, if financed through the scheme). The portal shows every stage, so you never need to depend on the vendor or DISCOM office for status — you can see exactly where your application is stuck.
Eligibility criteria
- ✓Residential consumer with a grid-connected electricity connection from the local DISCOM
- ✓Valid electricity bill in the applicant's name
- ✓Rooftop rights and suitable shadow-free space
- ✓Installation by a DISCOM-empanelled vendor registered on the portal
- ✓Bank account name matching the electricity bill name (a common hold-up)
Documents required
- ✓Latest electricity bill
- ✓Aadhaar and PAN of the applicant
- ✓Bank passbook/cancelled cheque (name must match the bill)
- ✓Signed undertaking if asked for name-mismatch resolution
How to apply — step by step
- Log in at pmsuryaghar.gov.in with your registered mobile and OTP
- Open your application and note the current stage: feasibility, vendor selection, installation, inspection, commissioning, redemption
- If stuck at feasibility, follow up with your DISCOM sub-division
- After commissioning, submit bank details and redeem the subsidy on the portal
- CFA is processed by REC in about 15 days after redemption — track 'Payment Status' on the portal
- If held for name mismatch or low confidence score, upload the signed undertaking with name proof and re-submit
Important dates
The scheme runs till 31 March 2027. There is no separate deadline to redeem subsidy after commissioning, but delays in redemption directly delay your payment — redeem as soon as the commissioning certificate appears.
Common mistakes to avoid
- ✓Paying the full vendor amount upfront without confirming the vendor is empanelled on the portal
- ✓Bank account in a different name or spelling than the electricity bill
- ✓Waiting for the vendor to 'push' the subsidy — redemption is the consumer's own step on the portal
- ✓Believing agents who promise 'guaranteed subsidy' for a fee; CFA is automatic once stages complete
Frequently asked questions
How long does the PM Surya Ghar subsidy take?
Per the government's March 2026 statement, CFA is processed in about 15 days on average after the consumer makes the redemption request with correct details.
How much subsidy will I get?
₹30,000 for 1 kW, ₹60,000 for 2 kW, and ₹78,000 for 3 kW or above for residential rooftop systems.
My subsidy is held. What are the common reasons?
Bank account name not matching the electricity bill, or a low application confidence score — fixed by uploading the signed undertaking with a name proof.
Till when can I apply?
The scheme period ends 31 March 2027. Registration is open on the national portal.
Answer 5–7 simple questions and get your eligibility score in 2 minutes.
Check eligibility now →